Case study
37 days to a production‑scale maintenance capability
The harness took a full maintenance capability from its first requirement through design, build, test and documentation in 37 calendar days.
Evidence as of 2026-10-03
On this page
-
37 days
to build Planned Maintenance on the harness
Measured
A traditional build of the same scope takes 6 to 12 months.
-
75 to 90%
lower delivery cost than a traditional build
10 to 25 cost units against 100 for a traditional build.
-
5 to 10x
more delivered by the same team
AI assistance alone gives 1.25 to 1.75x.
Delivery models
| Delivery model | Time to deliver | Relative cost | Delivery capacity |
|---|---|---|---|
| Traditional | 6 to 12 months | 100 | 1x |
| AI-assisted | 4 to 9 months | 60 to 80 | 1.25 to 1.75x |
| AI harness | 37 daysMeasured | 10 to 25 | 5 to 10x |
-
Traditional
Time to deliver6 to 12 months
Relative cost100
Delivery capacity1x
-
AI-assisted
Time to deliver4 to 9 months
Relative cost60 to 80
Delivery capacity1.25 to 1.75x
-
AI harness
Time to deliver37 days
Relative cost10 to 25
Delivery capacity5 to 10x
About the figures: Figures with an asterisk are modelled planning ranges for suitable work. The harness time is measured on the Planned Maintenance build. See the methodology for how each range was set and what your results will depend on.
Effort on Planned Maintenance
- hours of human direction
- 28hours of human directionMeasured
- hours of AI agent work
- 228hours of AI agent workMeasured
- functional requirements
- 144functional requirementsMeasured
Central figures, each with a measured range.
Delivered capability
Planned Maintenance is available for use. Its scope includes:
- asset structures and maintenance plans;
- planned and corrective work;
- work orders, completed at a desk or on a phone;
- parts, procurement and costing;
- meter and condition data;
- reliability measures;
- notifications and escalation;
- AI-assisted operational queries.
Business impact
The harness ran the whole delivery, from the first requirement to the finished documentation. It kept the working context to hand, enforced the controls and ran the checks, and it kept the evidence as the work went. People made the decisions that needed judgement.
With a lower delivery cost, a larger product scope became practical.
Demanding information work
Software engineering is information work with demanding controls. A software team draws on complex knowledge, works across many tools and makes decisions where a mistake can be expensive.
The harness brings the same approach to finance, sales and operations. Each process needs context and tools for the work, controls and evidence to keep it safe, and people with authority over its decisions.
How we calculated the benchmark
AI and human effort
One person directed the build and AI agents did the work: eight hours of AI work per hour of human direction.
| Measure | Central figure | Range | How it was measured |
|---|---|---|---|
| AI agent execution | 228 hours | 165 to 280 | Active time in the session, counting any pause under 10 minutes as work. The range uses 5 and 30 minutes. |
| Human direction | 28 hours | 24 to 32 | Measured from the session as time to write each instruction and read before it. The person who directed the build, whose hours they were, sets the range. |
| Instructions | 250 | none | Counted from the session, 3,300 words in all. |
| Elapsed time | 37 days | none | From the first requirement on 22 August to the tested build on 27 September. |
In the same session, the agents also worked on other things, so each part of it counts towards Planned Maintenance only in proportion to the files changed in it.
No traditional or AI-assisted team has built this scope, so we compare it with planning ranges for those models. We explain in the methodology how we chose each range.
Requirements from practice
The requirements were checked against established practice, and 120 of the 144 functional requirements trace to a 167-point capability baseline taken from an established maintenance product. The remaining 24 are additions that are possible only in an integrated ERP, such as posting maintenance cost to the ledger.
Compliance and schedule measures follow the Society for Maintenance and Reliability Professionals. The environmental requirements follow ISO 14001, the Greenhouse Gas Protocol and IFRS S2, among other standards.
The result was 144 functional and 10 non-functional requirements, graded A before any code was generated, with 15 design decisions recorded alongside them. Under one decision a forecast occurrence is kept apart from the work order it becomes, and under another the plans, work orders and verification rounds run on a single workflow engine.
Build record
Delivery record
-
Define, 22 to 23 August
The harness wrote the requirements, the design and the design decisions in two days. On 23 August the harness refused the work 11 times at the definition checks, giving a reason each time, until the requirements reached grade A and the phase was locked.
Why it matters Requirements had to be precise and testable before any code existed.
Definition exit
- Requirements: 132 functional, 10 non-functional.
- Design decisions: recorded as numbered decision records.
- Exit: passed on the 11th attempt, grade A.
-
Generate, 25 to 29 August
The database tables, windows, fields and menus were generated from written specifications. Each of the 1,114 recorded runs passed a gate first. At the generation exit the harness regenerated the artefacts and compared them with what was committed, so any hand edit would have shown as a difference and failed the check.
Why it matters The configuration was generated, so all of it can be rebuilt from its specification.
Generation exit
- Generator runs gated: 1,114.
- Exit check: regenerate and compare, no differences.
- Exit: passed on 29 August.
-
Test, from 1 September
Each test case is linked by name to its requirement. Database rules, Java calculations and browser journeys through the windows are all tested, and screenshots are compared with approved baselines.
Why it matters A requirement counts as met only when it is named by a passing test.
Test record
- Test cases: 209, each linked to its requirement.
- Screenshots: 281 baseline and current images.
-
Scope added, in September
Seven requirements for asset tagging joined on 1 September, and five for reliability and warranty on 22 September. Each one went through the same steps as the rest, from a written requirement and generated configuration to a named test and a section in the user guide.
Why it matters New requirements joined the same process, so they were tested and documented like the rest.
Requirements added
- 1 September: tag issue, barcode and QR codes, re-tagging, verification of any asset.
- 22 September: defect causes, downtime, reliability measures, cover for critical assets, warranty.
The harness refused the requirements 11 times before any code was generated.
Finished modules
The finished work spans five modules. Three hold maintenance, the asset register and sustainability disclosure, and two small modules connect maintenance to fleet records.
63
new database tables, joined by 332 relationships
82
rules enforced in the database itself, alongside 23 triggers
10,200
lines of Java, for costing, scheduling, service levels and reporting
47
windows with 1,064 fields, and three workflows
Syntegra directed the work, and no line of the product's code was written by a person. The agents also produced a 13,700-word user guide for all the requirements, and help text on 374 fields, and the work went through 1,176 recorded gate runs, 97.6% of them passed.
Evidence trail
-
Requirements Requirements document and capability baseline, 22 August 2026
132 functional and 10 non-functional requirements, each traced to a baseline point or marked as an ERP addition.
-
Definition exit Gate log and phase lock, 23 August 2026
Passed on the 11th attempt, with the requirements, the design plan and the determinism checks all at grade A.
-
Generation exit Phase review, 29 August 2026
Generated artefacts regenerated and compared with the committed versions, with no differences.
-
Tests Test register, 27 September 2026
209 test cases, each linked by name to its requirement.
-
Documentation User guide, 27 September 2026
A user guide of 13,700 words, in which all 144 functional requirements are named.
Lessons learned
- Definition takes the time. The 11 refusals at the definition exit took most of a day, and generation then passed its exit on the seventh attempt.
- Authorship needs the session record. Commits carry the operator’s name, and some early commits lack the AI agent’s marker, so the claim that no person wrote the code rests on the session record as well as on version control.
- Tool gaps surface under load. During the build, the harness logged 127 gaps in its own tools, and each one was recorded for fixing.
Applying the approach elsewhere
You can run any substantial piece of information work the same way:
- start from an established baseline, and trace each requirement to it;
- grade the requirements before anything is built;
- generate configuration from specifications, and check that nothing was edited by hand;
- accept a requirement only when it is proved by a named test;
- measure the effort from the working record, and state the method with the figure.
Related reading
Getting started
Start with one process that matters to your business. Engagements are contracted through Syntegra Solutions.